CASE STUDY
400 kVA PowerLink Generator Reliable
Power for Essential Care Facilities
Project Overview
Client Requirement
- Pre-delivery Load Bank Testing: Full load simulation conducted to verify operational performance and reliability.
- Fuel Delivery System Options: Collaborated with engineering team and third-party provider to design site-specific fuel solutions.
- Service & Quality Checks: Comprehensive inspection of engine, alternator, control systems, and weather-protected, sound-attenuated enclosure.
- Transport & Deployment Prep: Unit securely loaded for transport, ensuring safe and ready-to-install delivery.
Solutions
- Conducted comprehensive pre-delivery load bank testing in our NSW workshop.
- Collaborated with our engineering team and a third-party provider to offer custom fuel delivery system options.
- Performed full service and quality checks to ensure the generator met the highest standards before leaving our facility.
Results
The generator was successfully transported to site, providing the facility with confidence that residents and staff are protected during any power disruption. For aged care, uninterrupted electricity isn’t just about convenience — it’s about safety, comfort, and peace of mind.